- Home
- Pages
- Our Services
- Telebelt Conveyor
Action Pumping
Our Story Action Concrete Pumping has been servicing Kamloops and its surrounding area since 1981, and has grown to be
The Windrise Wind Project – Fort Macleod
Attaining 180 ft heights, this impressive unit features a 5-section RZ boom configuration made of high quality, fine-grained steel in a box-type design for enhanced stability.
Metro Line – Northwest Expansion – Edmonton
Home Pages Our Projects Metro Line – Northwest Expansion – Edmonton Previous Next Extending the existing line from NAIT through
MX34-38Z Placing Boom
The RS 850 Tower System uses an M-profile design that incorporates the self-climbing and delivery systems into a
smaller footprint – just three-feet-three-inches (1.00m) square.
Conforms 16-4Z Spider Boom
The 16Z is a cost-effective solution for all low-ceiling indoor concrete placements. The low 13’ 1” opening height allows for operations in most commercial, warehouse, and tunnel pours.